| |

Soranethota Project – 1.4 MW

Soranethota Mini Hydro-power Project – 1.4 MW

Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.

Similar Posts

  • Sri Lanka visit by Burundi Govurment Officials

    Minister of Community Development of Burundi – Jean Baptiste Gahimbare and Director General of Water Supply & Energy for Rural Areas in Burundi – Ndayitwayeko Fulgence inspected several Mini Hydropower Projects in Deraniyagala and Nawalapitiyain July 2005, to assess the developments in the hydropower sector in Sri Lanka before they sign the Agreement with UNIDO….

  • | |

    Nyamyotsi Project – Stage I

    Nyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…

  • | |

    Upper Korawak Oya Project – 1.5 MW

    Upper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….

  • | |

    Factory Expansion

    Factory Expansion of RSL Ceramics Due to the high demand for our ceramics bath ware products, we are now in the process of expanding our Factory with modern European technological aspects. This is a project worth LKR 100 Mn. which is handling by Hydro Power International (Private) Limited. Constructions are going on in a 01…

  • |

    Shishyodaya Foundation

    With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…

Leave a Reply