A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama
| Capacity | 100.17 kW |
| Project Type | Supply, installation and Commissioning under Net Plus Scheme |
| Completion Year | 2017 |
| Solar Panel Provider& Technology Transfer | Alta Vision Solar |
A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama
| Capacity | 100.17 kW |
| Project Type | Supply, installation and Commissioning under Net Plus Scheme |
| Completion Year | 2017 |
| Solar Panel Provider& Technology Transfer | Alta Vision Solar |



Organize, lifestyle development and attitude build-up programmes for Government Officers and Semi-Government Sector Officers on the participation of reputed Professors and University Lecturers.
Venue: Galle Date: 22-Mar-2015
Karawila Ganga Mini Hydro-power Project – 0.75 MW The project utilizes the waters of Karawila Ganga in the Kegalle District in Sri Lanka to generate 0.75 MW of Electricity. The project is owned by Kandureliya Hydro Power (Pvt) Ltd. The main investor for the project was General Sales Company which is an associate company of…
With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…
Maliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….
Client Kenya Tea Development Agency Limited, Republic of Kenya Capacity 1.5 MW Location Meru County, Republic of Kenya Project Type EPC/Turnkey