Client | Kenya Tea Development Agency Holdings Limited, Republic of Kenya |
Capacity | 1.8 MW |
Location | Embu County, Republic of Kenya |
Project Type | EPC |

Similar Posts

Village Hydropower Projects – Sri Lanka
Dr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…

ENCO (Private) Limited
We set up our first company ENCO, to qualify for ESD Project and engaged in Off-Grid village hydro project development as a developer. Social mobilization, get village folks to team up to work for a dream of their own village hydro project, preservation of forest cover in the catchment area, and more interestingly how to…

Flower Offering Religious Event
Mal Pooja Venue: Matara Bodhiya Premises Date: 05-Nov-2014 This event had been organized as a tribute to Late Mrs. Prema Nanayakkara, dearest Mother of the Founder of our Company, Dr. Nishantha Nanayakkara

Shishyodaya Foundation
With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…

Rath Ganga Project
Rath Ganga Mini Hydropower Project – 2 MW Rath Gaga mini-hydro project with the capacity of 2 MW is a successful project completed by HPI in 2004 August. The significance of this project is that the main investors were from the UK. Overseas partners invested via a newly incorporated offshore company, New Energy Limited. This…

Nyamyotsi Project – Stage II
Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012