Client | Kenya Tea Development Agency Holdings Limited, Republic of Kenya |
Capacity | 1.8 MW |
Location | Embu County, Republic of Kenya |
Project Type | EPC |

Similar Posts

Solar Power Systems at RSL Ceramics Factory
A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama Capacity 100.17 kW Project Type Supply, installation and Commissioning under Net Plus Scheme Completion Year 2017 Solar Panel Provider& Technology Transfer Alta Vision Solar

Niriella Mini Hydropower Project – 3 MW
Niriella Mini Hydropower Project – 3 MW Trailed by the success of the Kabaragala Mini Hydro Project, HPI was awarded to construct another Turnkey Project in Niriella by the Naturub Group of Companies. This project was commissioned in September 2002 with a total generating capacity of 3 MW. Power base Technology (Pvt) Ltd. is the…

Alms Giving
Venue: Kataragama, Kiri Vehera Date: 12-Jan-2017

Attitude build-up Programmes
Organize, lifestyle development and attitude build-up programmes for Government Officers and Semi-Government Sector Officers on the participation of reputed Professors and University Lecturers.

Wee Oya Project – 6 MW
Wee Oya Mini Hydro-power Project – 6 MW Wee Oya is another successful mini hydro project developed by HPI for Power base Technology (Pvt) Ltd. and the second mini hydro plant developed by HPI with them. This clearly shows the confidence our clients have placed on us. The mother company of the Power base, Naturub…

Nyamyotsi Project – Stage II
Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012