We could win another competitive contract to upgrade the Nyamenga hydropower plant in the neighbouring nation of Burundi, from an existing capacity of 1.4 MW to 2.8 MW with two additional turbine-generator sets.

This plant augmentation was successfully completed and commissioned in June 2009.

Similar Posts

  • |

    Davora Tea Factories

    We again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…

  • | |

    Upper Korawak Oya Project – 1.5 MW

    Upper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….

  • | |

    Nyamyotsi Project – Stage II

    Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012

Leave a Reply