| Client | Rural and Renewable Energy Agency, Republic of Liberia |
| Capacity | 2.5 MW |
| Location | Lofa County, Republic of Liberia |
| Project Type | Supply & Installation |
| Remarks | The contract is awarded to the JV of ENCO, HPI & FUSO |
Similar Posts
TPA Representatives Visit in Sri Lanka in 2016
ByadminRepresentatives of “Terra People’s Association of Japan”, Ms. Ruri Okubo, Mr. Yamaji Kenzo, and 02 respectable donors including Mr. KasuoShingae visited Sri Lanka in March ’2016 to meet the scholarship holders of Shishyodaya Foundation. This event was successfully held with the participation of the…Principal of Sanghamitta College, Galle – Mrs. ChandaniUdakumbura, Teachers-In-Charge – Mrs. Chandima…
Access Road of Sri Jayathilakarama Temple, Hanguranketha
ByadminCompletely constructed the Access Road of “Sri Jayathilakarama Temple” of Metibemiya, Hanguranketha, and donated it to the Temple on 24/12/2017. This was the only road leading to the Temple which was in a poor state, prior to the road construction.
RSL Ceramics (Private) Limited
ByadminRSL Ceramics (Pvt) Ltd.(Delux) Is the leading manufacturer of premium quality ceramic bath ware products for the Sri Lankan market. They offer a wide range of sanitaryware products for affordable prices. Whether you are looking for the latest innovations, traditional or modern designs, vibrant colors, or international standards, RSL Ceramics is committed to providing you…
Pre-feasibility Studies on Hydropower potential in Japan
ByadminClient ZE Energy Inc., Japan Location Toyama Prefecture Sites 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River Commissioned In November 2014
Maliboda Project – 1 MW
ByadminMaliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….
ENCO (Private) Limited
ByadminWe set up our first company ENCO, to qualify for ESD Project and engaged in Off-Grid village hydro project development as a developer. Social mobilization, get village folks to team up to work for a dream of their own village hydro project, preservation of forest cover in the catchment area, and more interestingly how to…













