| Client | Kenya Tea Development Agency Limited, Republic of Kenya |
| Capacity | 1.5 MW |
| Location | Meru County, Republic of Kenya |
| Project Type | EPC/Turnkey |
Similar Posts
Solar Power Systems at RSL Ceramics Factory
ByadminA Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama Capacity 100.17 kW Project Type Supply, installation and Commissioning under Net Plus Scheme Completion Year 2017 Solar Panel Provider& Technology Transfer Alta Vision Solar
Yandohun Micro Hydro power Project – World Bank Funded Project in the Republic of Liberia
ByadminProject Yandohun Micro Hydropower Project Client Rural and Renewable Energy Agency, Republic of Liberia Project Type Off-Grid Capacity 60 kW hydro project with HT/ LT distribution network Beneficiaries 120 Households Remarks This is the First Hydropower Project done after 14 Years of Civil War in Liberia and the plant was gifted for the needy people…
Upper Korawak Oya Project – 1.5 MW
ByadminUpper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….
Hydropower Projects in Rwanda – On the Invitation of MININFRA
ByadminObserving the success of UNIDO Projects handled by ENCO (Pvt) Ltd., the Ministry of Infrastructure of the Government of Rwanda (MININFRA) invited us to design and build 8 new grid connected and off grid hydropower schemes along Rwanda’s North-South Central Mountain Range, with a total generation capacity of 6.35 MW. Site Visit carried out by…
Kaiha 2 Small Hydro-power Plant
ByadminClient Rural and Renewable Energy Agency, Republic of Liberia Capacity 2.5 MW Location Lofa County, Republic of Liberia Project Type Supply & Installation Remarks The contract is awarded to the JV of ENCO, HPI & FUSO
Village Hydropower Projects – Sri Lanka
ByadminDr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…