



| Client | ZE Energy Inc., Japan |
| Location | Toyama Prefecture |
| Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
| Commissioned In | November 2014 |




| Client | ZE Energy Inc., Japan |
| Location | Toyama Prefecture |
| Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
| Commissioned In | November 2014 |



Venue: Galle Date: 22-Mar-2015
Wee Oya Mini Hydro-power Project – 6 MW Wee Oya is another successful mini hydro project developed by HPI for Power base Technology (Pvt) Ltd. and the second mini hydro plant developed by HPI with them. This clearly shows the confidence our clients have placed on us. The mother company of the Power base, Naturub…
Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012
Conferment of a Computer Center for a Rural School “VIDULA COMPUTER CENTER” in collaboration with ENCO and DFCC Bank
Venue: Matara Date: 22-Nov-2017
A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama Capacity 100.17 kW Project Type Supply, installation and Commissioning under Net Plus Scheme Completion Year 2017 Solar Panel Provider& Technology Transfer Alta Vision Solar