Upper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….
Purpose; to introduce KUBOTA’s domestic sewerage treatment facility called Joukasou systems In the latter part of 2018, Fukada Environmental Development Industries Co., Ltd. (Japan), expressed interest in joining hands with us to introduce Japanese technology for sewerage/ kitchen water treatment facilities using KUBOTA’s technology which is the best in the world and affordable with good quality…
We set up our first company ENCO, to qualify for ESD Project and engaged in Off-Grid village hydro project development as a developer. Social mobilization, get village folks to team up to work for a dream of their own village hydro project, preservation of forest cover in the catchment area, and more interestingly how to…
Mutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010
Manelwala Mini Hydro-power Project – 2.4 MW Manelwala was completed by HPI in June 2008 as an EPC Contract. The main investor for the projects was Manelwala Hydro Power (Pvt)Ltd., which is same as Panasian Power (Pvt) Ltd. with joint investment with HPI and New Energy Ltd. in United Kingdom. Type of Contract Turn Key…
Client Ministry of Lands, Mines, and Energy, Republic of Liberia Sites 1. Jor River at Gbatala, Bong County 2. Du River at Kakata, Margibi County 3. Cestors River between Grand bassa and Sinoe Counties 4. St. John River at Gbedin, Nimba County 5. Dugbe River in River Gee County 6. Wozi Creek in Zorzor,…