KalawaAragam 10MW Biomass Power Plant
Construction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…

Gatubwe Project
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012

Kiruwana Oya Project
Kiruwana Oya Mini Hydro-power Project – 0.6 MW The project utilizes the waters of Kiruwana Oya in the Matara District in Sri Lanka to generate 0.6 MW of Electricity. The Project was developed by Nilwalabase Hydro Power (Pvt) Ltd., which was incorporated in 2004, mainly for developing grid-connected small power projects. The main investor of…

Davora Corporate Cricket Match
Venue: Galle Date: 22-Mar-2015

Monastery for Buddhist Monks
Build Chambers in Kalawana Area, a really calming place boarded to Sinharaja Forest and offered to Meditative Buddhist Monks in November 2017.

Solar Power Systems at RSL Ceramics Factory
A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama Capacity 100.17 kW Project Type Supply, installation and Commissioning under Net Plus Scheme Completion Year 2017 Solar Panel Provider& Technology Transfer Alta Vision Solar