Organize Health Campaigns annually as Social Welfare Projects in Remote Areas in Akuressa – Matara for Eye Testing & Identification of Non-Transferrable Diseases and donate Spectacles.
Similar Posts
Kabaragala Project
ByadminKabaragala Mini Hydro-power Project – 2.25 MW Kabaragala Mini Hydro Power project is the maiden turnkey project handled by HPI which is located at the far end of Nuwaraeliya. HPI handled all electro-mechanical and civil works of the project from grass root level and successfully commissioned it in May 2001 with a total generating capacity…
All Night Pirith Chanting
ByadminVenue: Kataragama, Kiri Vehera Date: 12-Jan-2017
Transmission Line Project from Habarana to Veyangoda
ByadminConstruction of 220 kV Transmission Line Project from Habarana to Veyangoda
Upper Korawak Oya Project – 1.5 MW
ByadminUpper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….
Davora Corporate Cricket Match
ByadminVenue: Galle Date: 22-Mar-2015
Soranethota Project – 1.4 MW
ByadminSoranethota Mini Hydro-power Project – 1.4 MW Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.

















