Organize Blood Donation Campaigns annually and motivate the community for such involvements.

Similar Posts

Sri Lanka visit by Burundi Govurment Officials
Minister of Community Development of Burundi – Jean Baptiste Gahimbare and Director General of Water Supply & Energy for Rural Areas in Burundi – Ndayitwayeko Fulgence inspected several Mini Hydropower Projects in Deraniyagala and Nawalapitiyain July 2005, to assess the developments in the hydropower sector in Sri Lanka before they sign the Agreement with UNIDO….

Gatubwe Project
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012

Nyamyotsi Project – Stage II
Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012

Nyamyotsi Project – Stage I
Nyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…

KalawaAragam 10MW Biomass Power Plant
Construction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…

Yandohun Micro Hydro power Project – World Bank Funded Project in the Republic of Liberia
Project Yandohun Micro Hydropower Project Client Rural and Renewable Energy Agency, Republic of Liberia Project Type Off-Grid Capacity 60 kW hydro project with HT/ LT distribution network Beneficiaries 120 Households Remarks This is the First Hydropower Project done after 14 Years of Civil War in Liberia and the plant was gifted for the needy people…