Build Chambers in Kalawana Area, a really calming place boarded to Sinharaja Forest and offered to Meditative Buddhist Monks in November 2017.

Similar Posts

Davora Tea Factories
We again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…

Pre-feasibility Studies on Hydropower potential in Japan
Client ZE Energy Inc., Japan Location Toyama Prefecture Sites 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River Commissioned In November 2014

Batathota Project – 1.5 MW
Batathota Mini Hydro-power Project – 1.5 MW Batathota was completed by HPI in February 2007. The specialty of this project is HPI handled only the Electro Mechanical installations in Sri Lanka. The greatest challenge was to collaborate with different entities as there were many external parties involved with the project. Finally, we were able to…

Gatubwe Project
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012

KalawaAragam 10MW Biomass Power Plant
Construction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…

Yandohun Micro Hydro power Project – World Bank Funded Project in the Republic of Liberia
Project Yandohun Micro Hydropower Project Client Rural and Renewable Energy Agency, Republic of Liberia Project Type Off-Grid Capacity 60 kW hydro project with HT/ LT distribution network Beneficiaries 120 Households Remarks This is the First Hydropower Project done after 14 Years of Civil War in Liberia and the plant was gifted for the needy people…