Venue: Godagama
Date: 25-Sep-2015















We set up our first company ENCO, to qualify for ESD Project and engaged in Off-Grid village hydro project development as a developer. Social mobilization, get village folks to team up to work for a dream of their own village hydro project, preservation of forest cover in the catchment area, and more interestingly how to…
Conduct skill development and self-motivation programs for villagers in rural areas.
Maliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….
We again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…
Niriella Mini Hydropower Project – 3 MW Trailed by the success of the Kabaragala Mini Hydro Project, HPI was awarded to construct another Turnkey Project in Niriella by the Naturub Group of Companies. This project was commissioned in September 2002 with a total generating capacity of 3 MW. Power base Technology (Pvt) Ltd. is the…
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012