Construction of 220 kV Transmission Line Project from Habarana to Veyangoda
Similar Posts
Solar Power Systems at Veddagala Factory
ByadminA Project on Solar Power Systems at Veddagala Factory Premises, Kalawana. Capacity 101.25 kW Project Type Supply. installation and Commissioning under Net Plus Scheme Completion Year 2018 Solar Panel Provider & Technology Transfer Alta Vision Solar
Hydropower Projects in Rwanda – On the Invitation of MININFRA
ByadminObserving the success of UNIDO Projects handled by ENCO (Pvt) Ltd., the Ministry of Infrastructure of the Government of Rwanda (MININFRA) invited us to design and build 8 new grid connected and off grid hydropower schemes along Rwanda’s North-South Central Mountain Range, with a total generation capacity of 6.35 MW. Site Visit carried out by…
Solar Power Systems at RSL Ceramics Factory
ByadminA Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama Capacity 100.17 kW Project Type Supply, installation and Commissioning under Net Plus Scheme Completion Year 2017 Solar Panel Provider& Technology Transfer Alta Vision Solar
Davora Tea (Private) Limited
ByadminDavora Tea was incorporated in 2015, aiming the local sales and exports of Ceylon Tea manufactured in our own Tea Factories. We have a strong bond with our respective Tea Brokers and we consult them as and when required, like when we need to go for perfect blends such as to maintain the quality and…
Iraru Small Hydro Electric Power Project
ByadminClient Kenya Tea Development Agency Limited, Republic of Kenya Capacity 1.5 MW Location Meru County, Republic of Kenya Project Type EPC/Turnkey
Mutubo Project
ByadminMutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010













